足球波胆预测

Plate heat exchanger plate installation method

hit count: Updated: 17/07/03 10:26:07 Source: coinaccel.com [ close ] share:

    在经历一段使用年限之后,会出现结垢的现象,特别是在水水、汽水的工况,冷测水由于高温加热之后会产生一些钙镁离子,然后附着在板片的表面,长此以往,就会降低换热器板片的传热效率,给换热带来不好的影响。 After the plate heat exchanger has been used for a period of time, scaling will occur, especially in the working conditions of water, soda, and cold test water due to high temperature heating will generate some calcium and magnesium ions, and then adhere to the surface of the plate In the long run, the heat transfer efficiency of the heat exchanger plate will be reduced, which will have a bad effect on the heat exchange.

    MBR0.4型板式换热器

    At this time we need to clean it, but we need to remove the plate during cleaning, so we must install it properly after cleaning:
    1. The step of installing the plate heat exchanger plate is very important. Because the seal of the plate must be inspected for damage during the installation process, it is necessary to check one plate and install one. If the inspection and replacement of the gasket is ignored, it will cause leakage during the pressure test operation of the plate heat exchanger, and rework will waste time and labor, and may delay heating.
    2. There are more than 160 plates on each heat exchanger. Based on the inspection of the gaskets, many people cooperate to install each plate to ensure that the plates are installed in place and do not leak.
    contact us
    Contact: Zibo Taylor Heat Exchange Equipment Co., Ltd.
    Mobile: 13573335466
    Phone / Fax: 0533-4262767
    Email: 2313096826@qq.com
    Address: Fushan Industrial Park, Boshan District, Zibo City, Shandong Province